Throughout this week me and my partner had to start the Pre-Production paper work which we had to complete in order for us to start the filming. The production work had things such as Cast List, Location Reccies and Risk Assessments that we had to get done before we start filming.

This week we had IT Exams which meant the Pre-production paper work had to be left until the weekend which meant we would fall behind the class if we didn't do it through the weekend. Me and my partner Prabhjyot split the work between the two of us so that the work load would be less. As we had an IT exam the following week we only had the Cast List and Risk Assessment forms completed. We had to ensure that the following week we had everything else done even though we had another IT Exam the following week.

The progress we made throughout this week was minimal due to the exams but we got two of the Production paperworks done which was mentioned above which were the Cast Li
st and Risk Assessment. As mentioned our challenges which we faced were the fact that we had exams other than that everything was all right. Also my partner prab did get a few of the other paper work done such as the crew list & Prop list. All together as a group we did quite well.

The target I have for next week is that I need to complete the Location Reccies and Prabhjyot would finish the rest of the pre-production paperwork. The story board here is the most important piece of pre-production as we can refer to it when we are filming and what the actual advert look like when the advert is done (Narrative)